They offer stability and toughness into the formwork, guaranteeing the concrete is correctly contained and formed throughout the pouring procedure.Set up: Drill pilot gap with the façade content and into your backup materials to the desired embedment depth + one" using proper drill little bit(s) during the chart beneath. Drill need to be in rotati